PRODUCT PARAMETER
Dimension 5800mm*2500mm*2450m
Drain system Direct drainage
Life span 10 years
Level of earthquake 7
Level of wind resistance 10
Fireproof rating Class A
Frame thickness 2.0 mm
Warranty more than 3 years
Appliance Hotel,Dorm, storage

Product Description

I. Specification Information

• External Dimensions of 20ft: Length × Width × Height is 5.9m × 2.5m × 2.47m.
• Internal Dimensions of 20ft: Length × Width × Height is 5.9m × 2.34m × 2.28m.
• Structural Materials: Galvanized cold-rolled section steel is used.
• Walls: 50mm thick rock wool sandwich panels with Class A fireproof performance.
• Roof: 0.4mm thick galvanized color steel plate plus 50mm rock wool.
• Floor: 18mm fireproof cement fiber board with 1.6mm PVC flooring.
• Live Load: 200kg/m².
• Wind Resistance Coefficient: 45m/s.
• Insulation Coefficient: Greater than R3.5.
• Service Life: More than 15 years.

 

II. Materials and Structure

• Materials: Steel beams, steel columns, and purlins usually use Q235B cold-bent galvanized light steel. The strength of the steel is 215N/m².
• Earthquake Resistance Performance: The structure can resist earthquakes of magnitude 8. The seismic grouping design is the first group. The site characteristic period is considered as 0.45s. The construction site category is considered as Class
III. The damping ratio of the steel structure is 0.05. The maximum horizontal seismic influence coefficient αmax is 0.04 (calculated according to 5 years).
• Safety Level: The structural safety level is grade 2, and the coefficient of importance is 1.0.

III. Installation Steps

• Unfolding the Roof: Use a crane to lift the roof. Slowly lift it until the house is unfolded in place and then stop the crane operation.
• Unfolding the Front and Back Walls: Push the front and back walls of the container from the inside to make them unfold and stand in the correct position.
• Fixing the Structure: Use bolts to fix the entire structure. There are pre-made bolt holes on the columns, and enough bolts will be provided for you to fix.
• Installing the Door Lock: To avoid the door lock from damaging the ceiling during the folding process, the door lock will not be installed in advance. If you need to move the house to another place and carry out the folding operation, please remember to remove the door lock in advance. 